Our contribution to fight global warming
For over 50 years, we provide hard-to-abate industries with carbon capture solutions. Let's delve into history, tracing ASCO's journey through the decades.
Landmark Power Holdings
- Location
- Project
- Capacity
- UK
- Flue Gas / Power Generation
- 4 tons / hr
Unique project that deliver UK’s first decarbonised energy power plant. This will be a game changer and a model of sustainable energy generation worldwide to achieve the "net- zero" climate goals.
Regionalwerke Baden
- Location
- Project
- Capacity
- Switzerland
- Biogas / Power Generation
- 0.5 tons / hr
The pioneering project aimed to establish the first facility of its kind in Europe, directly connected to biogas processing. Realizing this endeavor presented significant challenges. We had to develop innovative solutions that did not yet exist as standard. With the plant's capacity to produce up to 4,000 tons of liquid CO₂ annually, meeting food-grade standards, we have taken a substantial stride towards a more environmentally friendly energy future for RWB.
Hochdorf Swiss Nutrition
- Location
- Project
- Capacity
- Switzerland
- Flue Gas / Steam Boiler
- 0,3 tons / hr
The innovative stack gas recovery plant technology scores with an environmentally friendly overall concept for CO₂ recovery. The modern system allows Hochdorf to recycle more than 90 percent of the CO₂.
The next big step: Carbon Capture and Storage (CCS)
- Location
- Project
- Capacity
- N/A
- Twence
- 100.000 TPA
CO2 Stack Gas Recovery Plant (SGR): The system works with the flue gas slipstream from a natural gas-fired power plant and recovers 6 tonnes of CO2 per day.
Other projects
Petrochemical Company
Year
2003
Location
Azerbaijan
Plant Size
15 tons / hr
Type
Oil & Gas
Source
Flue Gas / Refinery
MeTL Group
Year
1999
Location
Tanzania
Plant Size
2 tons / hr
Type
Agricultural, industrial & consumer goods.
Source
Flue Gas / Power Generation
Strongpack
Year
2008
Location
Nigeria
Plant Size
1 tons / hr
Type
Beverage Industry
Source
Flue Gas / Power Generation
Regionalwerke Baden
Year
2015
Location
Switzerland
Plant Size
0.5 tons / hr
Type
Biogas
Source
Power Generation
GreenCo₂
Year
1994
Location
Belgium
Plant Size
11.5 tons / hr
Type
E-Fuel Production / Bio Refinery
Source
Biomass
ConstellationBrands
Year
2021
Location
Mexiko
Plant Size
4 tons / hr
Type
Brewery
Source
Fermentation
Orient Bio Fuels Company Limited (OBF)
Year
1989
Location
Vietnam
Plant Size
3 tons / hr
Type
E-Fuel Production / Bio Refinery
Source
Biomass
Frutura
Year
2005
Location
Austria
Plant Size
1 ton / hr
Type
Food Farming
Source
Natural Source
The next big step: Carbon Capture and Storage (CCS)
- Location
- Project
- Capacity
- Nottinghamshire, England
- Rhodesia
- 10MW
According to the International Energy Agency (IEA), CCS could contribute to reducing global CO₂ emissions by nearly 20% by 2050, and the technology might help to reduce the cost of climate change mitigation by approximately 70%. These numbers underscore the potential of CCS as a critical tool in our arsenal to combat climate change and the need for its widespread adoption in the near future.
To create planetary change, we seek partnerships with industry leaders.
We are here together
It is the future of our children and grandchildren that is at stake and it takes all of us to make the necessary change possible. We need people from all walks of life.